SCOPE

  1. Feasibility Study

  2. Cost/Benefit Analysis

  3. Creation of District Boundaries

  4. Homeowner Petition Coordination

  5. City application

  6. Environmental Clearances

  7. Project Scheduling

  8. Easement Preparation

  9. Right-of-way Acquisition

  10. Utility Research

  11. Horizontal & Vertical Control

  12. Construction Survey

  13. Aerial Photo Mapping Coordination

  14. Construction Plans

  15. Sewer Profiles

  16. Sewer Lift Station Design

  17. Construction Details

  18. Specifications

  19. Construction Inspection

  20. Gas Main Extension Coordination

Bakersfield, California



Properties located in Northeast Bakersfield were prevented from development due to lack of sewer facilities. We were contacted by property owners and the City of Bakersfield to form an assessment district and provide engineering for 14.1 miles of sewer main.


On the Northeast Sewer Project, we served as the consulting firm responsible for the full life-cycle of the project from the feasibility stage through construction inspection.


Specific study areas we evaluated for this project included:

  1. reconnaissance, topographic surveys, planning and feasibility studies

  2. various pipe materials for their compatibility with planned trench depths

  3. existing soil conditions

  4. the cost of imported backfill material verses native material

Northeast Sewer Assessment District 93-1

PORTER & ASSOCIATES, INC.